Interior Office Project - Thien Long Factory

Thien Long is a leading  company in the fields of produce and stationary business, providing pencils, study tools and office equipments. With wide distribution system, Thien Long expanded market through several countries, affirming Viet position – brand on the world

  • Date

    2022

  • Client

    Thien Long Group

  • Project type

    Construction, Decor, Office,

  • Location

    Tan Tao Industrial Park, District Binh Tan, Ho Chi minh City

  • Project Status

    Completed

img
img
img
img
img
img
img
img

Overview Project

Project: Thien Long Office

Construction Processing Interior Office Design Project Thien Long

Information progress

Levin Decor start up progress by receive information about the project. After that, we open status survey to have a boarder view at the eviroment and condition workspace. After understanding the condition, we progressing needs research to ensure the desgin will meet the right goals and Thien long require and suggestions.

Research Needs and Design Suggestion

We continuously by research needs to ensuring every design reflecting right goals and Thien Long needs. Levin Decor suggest preliminary design, including plan layout and content ideas as an basis and adjust for discusstion with investor to reach consensus.

Adjust Design and Detail Implenmentation.

We procceding to adjust preliminary design base on Thien Long requires and needs. After that, Levin Decor starting process detail implenmentation, including research and design detail implenmentation, 3D perspective and 3d design adjustment to ensure perfection and compathbility with projects target.

Deploy construction document

Construction document is a importance step to turn project into reality. Levin Decor implenmentation construction technology document, including interior office, fitout, M&E and complete construction document to ensure consistency and confront blueprint.

Handover

Finally, after complete project, Levin Decor procceding design – construction document handover, volume table by – estimate, Spec material table (if any) Thien Long. We are conducting author supervision to ensure quality and construction compliance, while ensure Thien Long satistification with final result. All these steps contribute to the design and implenmentaion process in a sucess and effective way.

>>>👉 Explore more outstanding projects at  www.levindecor.vn

Contact Information:

  • Address: LEVIN BUILDING, DD5 Street, An Suong Residential Area, Tan Hung Thuan Ward, District 12, Ho Chi Minh City
  • Hotline: 0909694047
  • Email: office.levindecor@gmail.com
  • Facebook: Nội thất Le Vin Decor
  • YouTube: Le Vin Decor Official

Similar Projects

.
.
.
.

Thông tin bảo hành

Tư vấn miễn phí

Tặng bản thiết kế miễn phí. Nhận tư vấn chi tiết về các gói dịch vụ thiết kế, thi công từ Levin Decor

Giới thiệu người ứng tuyển

Nộp hồ sơ ứng tuyển