Interior Office Project - Menchuen Factory

Established in 1987, MEN CHUEN FIBRE company has head office planning and globaly business strategic located Taipei while its yarn mil, and dyeing and finishing mill, processing mill, and distribution center are located in Taoyuan city – Taiwan, and  Dong Nai province – Viet Nam.

Levin Decor acompany MEN CHUEN FIBRE on office design project , creating modern workspace, optimize function, contribute enhacne enviroment work rate and business operate efficiency.

  • Date

    2024

  • Client

    Menchuen Office

  • Project type

    Construction,

  • Location

    Giang Dien Industrial Park, Trang Bom District, Dong Nai - Area: 4000m2

  • Project Status

    Completed

img
img
img
img
img
img
img
img
img
img
img
img
img
img
img
img
img
img
img
img

Office Interior Design Project – Menchuen Factory – Giang Dien Industrial Park, Dong Nai

1. Introduction of the Investor

Menchuen is an industrial manufacturing enterprise with a modern, professional development orientation, focusing on building a safe and efficient working environment. Menchuen desired a synchronized office and factory space that optimizes functionality and expresses the company’s unique style.

2. Partnership Opportunity

Menchuen learned about Le Vin Decor through highly acclaimed factory and office interior construction projects in Dong Nai and neighboring provinces. After thoroughly researching Le Vin Decor’s capabilities and working style, Menchuen decided to collaborate on the design and construction of their factory project at Giang Dien Industrial Park. The partnership was built on trust and a shared vision for expertise and creative solutions.

3. Office – Menchuen Factory Interior Design Process

Step 1: Information Reception and Current Site Survey

  • Information Reception: We listened to Menchuen’s specific desires and requirements for a modern, friendly office and factory space that prioritizes safety and operational convenience.
  • Current Site Survey: Le Vin Decor’s team directly surveyed the existing premises, factory structure, and related technical elements.
  • Needs Research: We analyzed Menchuen’s operational model, departments, and production processes to gain a deep understanding of their space utilization goals.
  • Design Orientation Board: All information was compiled into a design orientation board, serving as the basis for the next implementation steps.

Step 2: Needs Analysis and Preliminary Design Proposal

A preliminary design was prepared, including:

  • Layout Plan: Clearly demarcating office workspaces, meeting rooms, executive areas, pantries, and factory utilities.
  • Concept Idea: Developing a modern design style, using neutral tones combined with accent colors representing Menchuen’s brand identity.
  • Preliminary Design Adjustment: Close communication with Menchuen was maintained to receive feedback and adjust the layout and concept until an optimal solution was finalized.

Step 3: Adjustment and Detailed Design Development

  • Detailed Design Implementation for Each Area: Detailed technical drawings were created for both the office and production areas.
  • 3D Perspective Design: Vivid 3D perspectives were rendered to clearly illustrate the actual space, helping Menchuen easily visualize it.
  • Design Adjustment: Adjustments were made based on the investor’s requirements to ensure the highest level of satisfaction.
  • Completion of Design Dossier: The complete technical design dossier was finalized and prepared for the construction phase.

Step 4: Construction Dossier Deployment

The technical construction dossier was deployed, including:

  • Office Furniture: Desks, chairs, cabinets, partitions, and storage systems optimizing space.
  • Fit-out: Construction of walls, ceilings, floors, doors, and related to building items
  • M&E: Electrical, air conditioning, network, lighting, and fire protection systems ensuring safety and efficient use.
  • Completion of Construction Dossier: Ensuring detailed, synchronized, and easily implementable in reality on schedule.

Step 5: Project Handover and Supervision

  • Handover of Design – Construction Dossier: All technical documents and drawings were fully handed over to Menchuen.
  • Quantity – Estimate Table: Detailed and transparent calculations helped the investor effectively control costs.
  • Material Sample Specification Table: Supported the selection of suitable materials in terms of quality and aesthetics.
  • Author’s Supervision: Le Vin Decor closely monitored the construction process to ensure the project was built according to the design and maintained high quality.

Contact Le Vin Decor

Are you looking for a professional, dedicated, and creative office and factory interior design and construction unit? Le Vin Decor is always ready to accompany you on every journey to create a world-class workspace.

Contact Information:

  • Address: LEVIN BUILDING, DD5 Street, An Suong Residential Area, Tan Hung Thuan Ward, District 12, Ho Chi Minh City
  • Hotline: 0909694047
  • Email: office.levindecor@gmail.com
  • Facebook: Nội thất Le Vin Decor
  • YouTube: Le Vin Decor Official
  • 👉 Explore more outstanding projects at www.levindecor.vn

Similar Projects

.
.
.
.

Thông tin bảo hành

Tư vấn miễn phí

Tặng bản thiết kế miễn phí. Nhận tư vấn chi tiết về các gói dịch vụ thiết kế, thi công từ Levin Decor

Giới thiệu người ứng tuyển

Nộp hồ sơ ứng tuyển